1985
Plant commissioned with a 200 TPD kiln with a four-stage preheater. Before the advent of this technology, cement plants used wet process in which heat (coal) and electricity consumption was very high.
The four-stage preheater technology, introduced in 1980s, uses less coal and electricity
1998
Installed a KIDS® cooler, which is a clinker inlet distribution system developed by the German company, IKN.
Installation of the cooler helped the process by reducing heat (coal) consumption and the maintenance time and interval.
Variable Frequency Drives (VFDs) for raw mills and coal mill
2008
Undertook a brownfield capacity expansion by adding an additional six-stage calciner preheater, kiln and pendulum cooler, and a 2.5 MTPA cement-grinding capacity adjacent to the existing kiln
2015
Acquired a 1.0 MTPA plant from BMM Cement (with proceeds from Vicat JV SCL stake sale)
2016
Acquired the unit in Bayyavaram
2017
Consolidated position in the South
Expanded in the East
Gradually ramped up the Bayyavaram capacity to 0.3 MTPA
2018
Bayyavaram capacity ramped up to 1.5 MTPA
SCRL production ramped up to 1.25 MTPA
2021
1.0 MTPA integrated plant in Madhya Pradesh (Satguru Cement)
1.50 MTPA capacity grinding at Jajpur, Odisha (Jajpur Cement)
2025
10.00 MTPA
Through organic and
inorganic growth