Plants
Mattampally, Telangana Sagar Cements Limited

Capacity | 3.0 MTPA |
Key markets | Andhra Pradesh, Telangana, Tamil Nadu, Odisha, Maharashtra |
Limestone reserves | 815.04 MnT |
Captive power | 26.25 MW |
Thermal power | 18 MW |
Green energy | 10.05 MW |
Gudipadu, Andhra PradeshSagar Cements (R) Limited

Capacity | 1.25 MTPA |
Key markets | Andhra Pradesh, Karnataka, Tamil Nadu |
Limestone reserves | 162.93 MnT |
Captive power | 25 MW |
Thermal power | 25 MW |
Bayyavaram, Andhra PradeshSagar Cements Limited

Capacity | 1.5 MTPA |
Key markets | Vizag, Vizianagaram, Srikakulam, South Odisha |
Captive power | 8.42 MW |
Green energy | 8.42 MW |
Captive power plants
Source of energy | Installed capacity | Location |
---|---|---|
RENEWABLE | ||
Solar | 1.25 MW | Mattampally, Telangana |
80 KW | Corporate office, Hyderabad, Telangana | |
120 KW | Bayyavaram | |
Hydro electric | 4.3 MW | Guntur, Andhra Pradesh |
4.0 MW | Kurnool, Andhra Pradesh | |
Waste Heat Recovery System (WHRS) | 8.8 MW | Mattampally, Telangana |
RENEWABLE TOTAL | 18.55 MW | |
NON-RENEWABLE | ||
Thermal | 25 MW | Gudipadu, Andhra Pradesh |
18 MW | Mattampally, Telangana | |
NON-RENEWABLE TOTAL | 43 MW | |
TOTAL | 61.55 MW | |